| This
relatively low volume steel part originally had
a predicted life of 1-1/2 years. So machine cost
and delivery were important.
But part life was eventually extended, and volume
increased. The machine was then retrofitted to
fixture 2-up.
- Original
cycle: 17 seconds floor-to-floor
- Drills
4 double-angle radial holes and mills 2 flats
|